Glen Eira Sports & Aquatic Centre

100
kW
Roof-top solar installation at GESAC

With 384 solar panels on its roof, the Glen Eira Sports & Aquatic Centre is one of the largest solar power systems on a local government building. Making the switch to solar on such a high energy use building makes sound commercial sense and is central to Glen Eira’s plan to improve energy efficiency in Council buildings.

Project Overview

  • Client
    City of Glen Eira
  • Project
    Glen Eira Sports & Aquatic Centre
  • Project Location
    Bentleigh East
  • Solar System Type
    Grid Connected
  • Solar System Size
    99.84 kW
  • Project Installed
    June, 2016

System Overview

  • PV Modules
    384 x JA Solar 260W Poly
  • Panel Warranties
    10 years product
  • 25 years performance
  • Inverter/s
    4 x Surpass SPS25KTL
  • Inverter Warranty
    5 years
  • Install & Design
    CEC-accredited, 5 year warranty

System Performance

  • Expected Output
    416 kWh per day
  • Expected Energy Yield
    151,879 kWh per year

Environmental Benefits

  • Greenhouse Gas (CO2) Reduction
    204 tonnes per year

Get a Quote

Please complete the form and one of our solar consultants will get in touch within 48 hours. If you would like to speak to someone sooner, please call us on 1300 884 898.

  • This field is for validation purposes and should be left unchanged.